SSAW Pipe Forming Method

Home > Blog > SSAW Pipe Forming Method

Spiral Submerged Arc Welded (SSAW) steel pipes have become increasingly popular in various industries due to their excellent strength, durability, and cost-effectiveness. As a vital component in pipeline systems, understanding the SSAW steel pipe forming method is crucial for engineers, contractors, and project managers. This comprehensive guide will delve into the intricacies of the SSAW pipe production process, exploring the steps involved, the influence of steel strip orientation, and how dimensional accuracy is maintained in large-diameter pipes.

What are the steps involved in the spiral submerged arc welding (SSAW) process?

The SSAW pipe forming method is a sophisticated process that involves several key steps to produce high-quality, large-diameter pipes. Let's examine each stage in detail:

1. Steel Strip Preparation

The process begins with the careful selection and preparation of steel strips. These strips, also known as skelp, are typically hot-rolled coils of steel that meet specific quality standards. The strips are inspected for defects, cleaned, and sometimes treated with anti-corrosion coatings. The width and thickness of the strip are crucial factors that influence the final pipe dimensions.

2. Coil Feeding and Alignment

Once prepared, the steel strip is fed into the SSAW steel pipe forming machine. Precise alignment is critical at this stage to ensure the strip follows the correct spiral path. Advanced machines use laser guidance systems and computerized controls to maintain accurate positioning throughout the process.

3. Spiral Forming

As the strip enters the forming section, it is gradually bent into a spiral shape. This is achieved using a series of rollers that progressively curve the steel. The angle at which the strip is fed into the machine determines the spiral angle of the finished pipe. This angle, typically between 30 to 45 degrees, affects the pipe's properties and production efficiency.

4. Edge Preparation

Before welding can occur, the edges of the spiraling steel strip must be prepared. This involves beveling or chamfering the edges to create an optimal welding groove. Proper edge preparation ensures strong, consistent welds and reduces the risk of defects.

5. Tack Welding

As the spiral form takes shape, a tack welding process is applied to temporarily hold the edges together. This initial weld is not the final seam but serves to maintain the pipe's shape as it moves through the production line.

6. Submerged Arc Welding

The defining feature of SSAW pipes is the submerged arc welding process. In this step, a continuous wire electrode is fed into the seam, while a granular flux is simultaneously deposited to cover the weld area. The electric arc melts both the wire and the pipe edges, creating a strong, uniform weld hidden beneath the protective layer of flux. This process is typically performed on both the inside and outside of the pipe for maximum strength.

7. Cooling and Flux Removal

After welding, the pipe passes through a cooling section where it is allowed to solidify and cool gradually. The excess flux is then removed, revealing the finished weld seam.

8. Quality Control and Testing

The final steps involve rigorous quality control measures. Non-destructive testing methods such as ultrasonic testing, X-ray inspection, and hydrostatic pressure tests are employed to ensure the integrity of the welds and the overall pipe structure.

9. Finishing and Coating

Depending on the intended application, SSAW pipes may undergo additional finishing processes. These can include heat treatment to relieve stress, surface cleaning, and the application of protective coatings to enhance corrosion resistance.

Understanding these steps is crucial for anyone involved in the specification or use of SSAW steel pipes. The process combines precision engineering with advanced welding technology to produce pipes that meet stringent quality standards for various applications.

How does steel strip orientation influence the final form of SSAW pipes?

The orientation of the steel strip during the SSAW steel pipe forming process plays a significant role in determining the final characteristics of the pipe. This aspect of production is often overlooked but is crucial for achieving optimal pipe performance. Let's explore how steel strip orientation influences the SSAW pipe's properties:

Spiral Angle and Its Effects

The angle at which the steel strip is fed into the forming machine, known as the spiral angle, is a critical factor. This angle typically ranges from 30 to 45 degrees and has several implications:

  • Strength Distribution: The spiral orientation of the weld seam distributes stress more evenly around the circumference of the pipe compared to longitudinally welded pipes. This can result in better overall strength and resistance to external pressures.
  • Material Efficiency: Different spiral angles can affect the amount of steel required to produce a pipe of a given diameter. Optimizing this angle can lead to material savings without compromising pipe integrity.
  • Production Speed: The spiral angle influences the speed at which pipes can be produced. Generally, a steeper angle allows for faster production rates, which can be advantageous for large-scale projects.

Grain Direction Considerations

The orientation of the steel strip also affects how the grain structure of the steel aligns in the final pipe:

  • Anisotropic Properties: Steel typically has slightly different properties in the rolling direction compared to the transverse direction. The spiral forming process creates a pipe where these properties are distributed helically, which can enhance overall pipe performance.
  • Crack Propagation Resistance: The spiral orientation can help to impede crack propagation, as cracks must navigate a more complex path through the helical grain structure.

Weld Seam Placement

The orientation of the strip determines the position and angle of the weld seam:

  • Stress Distribution: The helical weld seam helps to distribute stresses more evenly compared to longitudinal seams, potentially increasing the pipe's resistance to internal pressure and external loads.
  • Inspection and Maintenance: The spiral weld pattern can affect how pipes are inspected and maintained in the field. Technicians must be aware of the unique weld geometry when performing non-destructive testing or repairs.

Dimensional Control

Strip orientation impacts the control over the pipe's final dimensions:

  • Diameter Precision: The spiral forming method allows for fine adjustments to the pipe diameter by altering the feed angle, enabling manufacturers to meet precise specifications.
  • Length Flexibility: SSAW pipes can be produced in longer continuous lengths compared to other pipe types, which is particularly advantageous for certain applications.

By carefully considering and controlling the steel strip orientation, manufacturers can optimize the SSAW pipe forming process to produce pipes with the desired combination of strength, efficiency, and dimensional accuracy. This level of control makes SSAW steel pipes suitable for a wide range of demanding applications in industries such as oil and gas, water transmission, and structural engineering.

How is dimensional accuracy maintained in large-diameter SSAW pipe production?

Maintaining dimensional accuracy in large-diameter SSAW pipe production is a complex task that requires a combination of advanced technology, precise control systems, and skilled craftsmanship. The challenge is particularly significant given the sheer size of these pipes and the tight tolerances often required for their intended applications. Here's an in-depth look at the methods and technologies employed to ensure dimensional accuracy:

Advanced Forming Equipment

At the heart of dimensional control is the sophisticated forming equipment used in SSAW pipe production:

  • Computer-Controlled Forming Machines: Modern SSAW pipe mills utilize computer numerical control (CNC) systems that precisely adjust the forming parameters in real-time. These systems can make minute adjustments to maintain the correct spiral angle, pipe diameter, and wall thickness throughout the production process.
  • Adaptive Roller Systems: The forming rollers that shape the steel strip into a spiral are equipped with adaptive positioning systems. These can adjust their position and pressure based on feedback from sensors, ensuring consistent curvature even as the steel properties may vary slightly within a coil or between different coils.

Continuous Monitoring and Feedback Systems

To maintain accuracy over long production runs, continuous monitoring is essential:

  • Laser Measurement Systems: High-precision laser systems constantly measure the pipe's diameter, ovality, and wall thickness. Any deviations from the specified dimensions are immediately detected and corrected.
  • Real-Time Data Analysis: Advanced software analyzes data from multiple sensors in real-time, allowing for predictive adjustments to the forming process before dimensional errors can occur.
  • Thermal Imaging: For large-diameter pipes, thermal imaging cameras monitor the temperature distribution during welding and cooling. This helps prevent distortions that could affect the final dimensions.

Welding Process Control

The welding process itself plays a crucial role in maintaining dimensional accuracy:

  • Automated Welding Systems: Computer-controlled welding heads adjust their position and parameters based on the exact position of the pipe seam, ensuring consistent weld quality and minimizing distortion.
  • Balanced Heat Input: By carefully controlling the heat input during welding, manufacturers can minimize thermal expansion and contraction that could lead to dimensional changes.
  • Simultaneous Internal and External Welding: Many large-diameter SSAW pipes are welded simultaneously from both inside and outside. This balanced approach helps to neutralize welding stresses that could otherwise cause the pipe to deform.

Post-Forming Adjustments

Even with precise forming and welding, some final adjustments may be necessary:

  • Mechanical Straightening: After welding, pipes may pass through straightening rollers that can make fine adjustments to correct any residual curvature or ovality.
  • Controlled Cooling: The cooling process is carefully managed to prevent uneven thermal contraction. Some manufacturers use specialized cooling beds that support the pipe evenly and allow for gradual, uniform cooling.

Quality Control and Inspection

Rigorous quality control measures are implemented to verify dimensional accuracy:

  • 3D Laser Scanning: Advanced 3D laser scanning technology is used to create a complete digital profile of finished pipes, allowing for comprehensive dimensional verification.
  • Ultrasonic Wall Thickness Measurement: Automated ultrasonic systems can measure wall thickness at multiple points around the pipe's circumference and along its length, ensuring uniformity.
  • Roundness and Straightness Tests: Specialized equipment is used to check the roundness and straightness of large-diameter pipes, often using multiple measurement points to create a detailed profile.

Material Selection and Preparation

Dimensional accuracy begins with the raw materials:

  • Precise Steel Strip Specifications: The steel strips used for SSAW pipe production are manufactured to tight tolerances for width and thickness. Any variations in the input material can affect the final pipe dimensions.
  • Edge Preparation: Accurate edge milling or beveling of the steel strip ensures that the edges align precisely during the spiral forming process, contributing to overall dimensional accuracy.

By employing these advanced techniques and technologies, manufacturers can produce large-diameter SSAW steel pipes with the high degree of dimensional accuracy required for critical applications. This precision is essential for ensuring proper fit during installation, optimal flow characteristics, and long-term structural integrity of pipelines and structural applications.

SSAW Pipe Manufacturer

Longma Group stands at the forefront of SSAW steel pipe manufacturing, leveraging cutting-edge technology and decades of expertise to produce pipes that meet and exceed international standards. Our commitment to quality, precision, and customer satisfaction makes us a trusted partner for projects requiring high-performance SSAW pipes.

Our product range includes SSAW pipes with outer diameters from 8 inches to 120 inches and thicknesses from SCH10 to SCH160, meeting diverse project requirements. We adhere to international standards such as API 5L, ASTM A53, ASTM A500, ASTM A252, and ASTM A795, ensuring our pipes meet the highest quality benchmarks. With flexible packing options including bundling, wooden boxes, and wooden pallets, we ensure safe and secure delivery of our products.

For more information about our SSAW pipes or to discuss your specific project needs, please don't hesitate to reach out to us at info@longma-group.com. Our team of experts is ready to provide you with comprehensive support and solutions tailored to your unique requirements.

References

  • "SHENGLI OIL& GAS PIPE HOLDINGS LIMITED"

  • "SSAW Pipe Manufacturer-TUSPIPE"

  • "Spiral Welded Pipe Manufacturing Process"

  • "Overview of submerged arc welding of steel pipes"

  • "Spiral submerged arc welded steel pipe technological process"