How to Import Epoxy Coated Carbon Steel Pipe: Key Steps

Home > Blog > How to Import Epoxy Coated Carbon Steel Pipe: Key Steps

Establish the project's requirements before importing epoxy coated carbon steel pipe. Then, check to see if the pipe's grade matches the coating style. Next, find a good manufacturer, get quotes on landed costs, approve samples, check production, and make plans for shipping and customs paperwork. The coating makes the pipe last longer, and each step helps keep it safe. If you work in the US for an EPC company or a procurement team and buy things for heating, water, or oil and gas projects, read this. Before you send out a request for quotes, here are ten good things you can do and ten bad things you should not do.

Prepare the Specification Before You Contact Any Supplier

A vague brief is the first step in most import problems. After the first four steps, everyone who bids can see what the goal is.

Step 1: Define the Project Requirements

Start by writing a brief. Write down the service (like fire protection, district heating, potable water, oil, or gas), the pressure at which it will work, the temperature range, whether it will be in water or soil, and how long you think it will last. After that, add the sizes. Longma Group's inventory of epoxy coated carbon steel pipe is available in the majority of line sizes and has an outside diameter of 60.3 mm and a wall thickness of 6.02 mm to 50.8 mm. It should have the length, the parts that hold the ends together, and the length. Remember that the coating has nothing to do with the pressure rating. The type of steel, the wall thickness, the way it was made, and the design code are what matter. All suppliers can give prices on the same item if the brief is clear. It's easy and fair to compare prices this way.

Step 2: Select the Pipe Grade and Epoxy Coating System

Pick the right pipe for the job. API 5L, ASTM A53, EN 10210, and AS/NZS 1163 are some of the pipe standards we offer. For line pipes, API 5L is used, and ASTM A53 is used for power and mechanical work. The next step is to give the system a name. Fusible bond epoxy (FBE) is put on the steel once it is about 450°F (232°C) hot. The powder melts, flows, and then forms a cross-linked film that hardens. How thick is the dry film? How is the surface prepared? How does it stick? How does it find breaks? How is it fixed? The thickness of an FBE is usually between 300 and 500 microns, but it can be different depending on the needs of your project. The phrase "epoxy coated" is not a technical term by itself.

Step 3: Verify Standards, Certifications, and Compliance

The rules need to be right for the US market and your use case. For paints, we follow the rules set by DIN 30670, DIN 30678, CSA Z245.20, EN 10339, ISO 21809-1, AWWA C210, and AWWA C213. In AWWA C213 and C210, epoxy systems that use liquid epoxy are talked about. AWWA C213 talks about epoxy that is fused to steel water pipes. Be careful not to use drinking water through the pipe until you know the coating meets NSF/ANSI 61 standards. It's not proven by a general ISO 9001 certificate. You should ask for lab test reports, product data sheets, and reports on how the coating was inspected. Bear in mind to record the heat levels and coating groups. When orders for important infrastructure are checked by a third party, they work well.

Step 4: Compare Epoxy Coating With Other Options

You should think about more than just price. You should also think about how the job will be done. If the conditions are right, heat-dip galvanizing can work. 3LPE and 3PE add a thick layer of polyethylene that protects against damage from rocks and handling. The system is still attached to the steel by an FBE layer. Stainless steel costs more, but it can handle things that are very harsh. A lot of water mains have cement on the inside. Because it sticks well to steel and stops corrosion, epoxy is often used for lines with a large diameter. Make sure it can handle corrosion, wear and tear, temperature changes, weight, and how easy it is to fix. Also, make sure it has been approved. They also use 2PP, 3LPE, and 3PE, so you can get prices for a lot of different choices from one place.

Qualify Suppliers and Compare Epoxy Coated Steel Pipe Quotes

It's time to pick a builder and learn how to compare bids. The next three steps will help you do that.

Step 5: Find and Qualify a Capable Manufacturer

Before you buy something, talk to the person. Traders can't change the steel, wire, or coating. What an item maker does. They've been making ERW and LSAW pipe, including epoxy coated carbon steel pipe, in a 230,000-square-meter space since 2003. We sold over 1,000,000 tons of goods every year until the end of 2023. We had buyers from over 90 different countries. TISCO, Baosteel, Shagang, and HBIS are some of the mills that make steel. From the time they are raw materials until they are pipes, we keep track of what they are. You should ask each supplier to show you proof that they are a real business along with reference projects, production photos, and quality control checks. We have many types of certificates, such as API 5L, ISO 9001, ISO 14001, and 18001. Before you sign, ask to see the factory.

Step 6: Prepare an RFQ and Compare Landed Cost

Anyone who wants to bid should be sent the RFQ. Give the amount, the outside diameter, the wall thickness, the grade of steel, how it was made, the type and thickness of the coating, the end finish, whether it needs to be inspected, how it was packed, where it's going, and when it will arrive. To see how much everything costs, like pipe, coating, inspection, packing, freight, and insurance, you can get a quote. Once you have that number, add up the costs of inland freight, duties, port fees, and customs broker fees for your US site. There are new Section 232 rules and any antidumping or countervailing duties that affect welded steel pipe. A licensed customs broker can help you learn about them. Check the quote's currency, terms of payment, Incoterms, and both the lead time for production and the transit time.

Step 7: Approve Samples and Pre-Production Details

You have to agree to the drawings, tolerances, markings, coating requirements, and packaging before they are made. Make sure you know whether the coating goes on after the flanges are beveled and welded or before. Get test pieces that have already been coated and coupons from a new supplier. Slices and inspection reports can show that welds close to them may have pinholes, weak edge coverage, blistering, or peeling. You can get ITP, MPS, and MTC documents here, so make sure you ask for them early. Then, make a list of the standards, test methods, warranty, delivery obligations, and ways to fix pipes that don't work as agreed. If there are clear criteria before production, the final inspection will be more objective and disagreements will be less likely to happen.

Control Quality, Shipping, and Installation of Epoxy Coated Carbon Steel Pipe

The coating is only useful if it stays whole when it gets there. The trench, the factory floor, and the trip across the ocean all have steps.

Step 8: Control Production and Coating Quality

First, the steel needs to be checked to make sure it's good. Check the grade, the wall's thickness, the quality of the weld, the wall's straightness, and the outcomes of any nondestructive or hydrostatic tests. The surface has to be cleaned and run over with something rough before it can be coated. Most people want to keep Sa 2.5 clean and have an anchor profile of 50 to 100 microns. Use a magnetic gage to find out how thick it is after being coated. Then you should check for adhesion, impact, cure, and holiday detection (NACE SP0490 covers FBE). Find out about cathodic disbondment data if you know that your line has it. Connect each record to the spot where it was made. If you have a lot of orders, you should find a third-party inspector to help you with the pre-shipment check.

Step 9: Arrange Packaging, Shipping, and Customs

Be sure to protect coatings on products in advance as they get damaged in shipping frequently. Pipe separators, soft slings, end caps, waterproof wrapping and strengthened bundles can be used to prevent your pipes from breaking when they strike anything or wear out. Before coming to the US, have the commercial invoice, packing list, bill of lading, certificate of origin, mill test certificates and inspection reports ready. You also require an Importer Security Filing and a customs bond for shipping goods by sea. Talk to your broker re the HS code. Explain how you will get it approved, manufacture the product, coat it, examine it, handle it at the port, load it on an ocean freighter, have it cleared, and drive it on a truck. When the goods come, check them out. Take pictures and register any claims immediately.

Step 10: Install, Repair, and Maintain the Pipe

The different type of industrial coating that will remain depends on the application. Dig holes, lay bedding, join surfaces, test and fill in gaps, with wide, soft slings or padded instruments. Do not use tools with sharp edges. Also, make sure you take the correct actions. The bare ends of the field welds can be covered using heat shrink sleeves, liquid epoxy kits, or field applied FBE. Be sure that it is compatible with the plant coating before shipping it out. If the surface is scratched, repair it with approved materials. Lay the backfill only after using a holiday detector to determine that it is safe. UV radiation can turn the pipe black if it has been outside for more than six months. Don't leave the pipe in the sun. And don’t forget to keep track of the checks, coatings, repairs and places. How long anything lasts relies on how well it was made, coated, maintained, and how much fluid it has in it.

Avoid Costly Mistakes and Finish With a Checklist

Buys that are well thought out can still go wrong in the end. You can share this list with your team and learn from the mistakes other people have made.

Common Importing Mistakes and How to Avoid Them

Most of the trouble is caused by five blunders. People choose the cheapest estimate, order only by diameter, think that "epoxy coated" means everything. They also don't read the certificates and don't see any damage that happened while the products are in transit. The walls are too thin, the grade is wrong, the coating is not thick enough, compliance tests fail and corrosion starts too soon. Set the standards, test criteria, coating, diameter, wall, grade, pressure and temperature all at the same time to make sure these problems don't happen. Make sure each certificate still works, and that it covers the proper items. Last thing you wanna do before cutting any steel is state in the contract who is responsible for repairs, replacements, freight, inspections and refunds.

How to Choose the Best Supplier for Epoxy Coated Pipe?

The lowest cost supplier is not always the best supplier. You want to compare the bids on their technical expertise, what they can coat, their certificates, their inspection methods, their capacity, their export experience, their communication, their charges and their post-sale assistance. Then give each project a score and some weight. If you are in an oil and gas EPC, you must be qualified for API 5L and be able to track things. They require the government’s permission to do what they want to do. Also crucial that the temperature is good for project that warms stuff. There’s no need to swap both the mill and the coater when the same company creates both the pipes and the coatings to keep them from rusting. This eliminates the need for coordination, and it also makes it apparent who is in charge if something goes wrong. What the seller does with claims once the items are out the door.

Epoxy Coated Carbon Steel Pipe Import Checklist

Get this list ready before you send out an order. The engineering, QA/QC, and logistics teams can sign off on one at a time because it sorts things by area.

  • Technical: Service Fluid Outside Diameter Wall Thickness Steel Grade Design Pressure Operating Temperature Coating Type Coating Thickness End Connections All required approvals such as AWWA C213 or C210 for water pipe, API 5L for line pipe, NSF/ANSI 61 where the pipe comes in contact with drinking water.
  • Supplier: Find out if the company is a manufacturer or a middleman. Check its factory capacity, certifications, reference projects, quality system, and export track record. Ask for a sample, a factory audit and an inspection & test plan. Ensure the same company responds for pipe quality and coating quality after delivery.
  • Commercial and logistics: Create a thorough RFQ and compute landed costs. To be agreed Incoterms, payment terms, production schedule, way of packing, customs documentation, warranty and claims procedure. Confirm onshore delivery and unloading plans at your site and identify the person who inspects the shipment upon arrival.

Prices stay the same for each supplier because this list is only looked over once. Also, holes are found early, when they are still easy and cheap to fix.

Conclusion

The ideal strategy to import epoxy coated carbon steel pipe is not to compare prices but to handle the process as if you had everything under control. The foundation consists of clear specs, validated certificates and a matching pipe grade and coating standard. Ensure the supplier is qualified, issue a similar RFQ, compare landing costs, and receive approval for a sample before you start producing. This will reduce the risk. The steel must be carefully assembled with field joint coating compatible with the film, inspection records and safety packing to ensure the steel is safe. One does not often order by the diameter, or trust the certificates, without first making sure that they cover enough. That is why the pipeline’s service life is determined by the quality records, not by guesswork.

FAQ

What should an RFQ include?

Write down the number, the outside diameter, the wall thickness, the steel grade, how it was made, the type of coating and how thick it is, the delivery port, the date of delivery, and the paperwork that needs to be filled out. You need to add the limits and test methods. So that everyone can quote on the same product, give all of the suppliers the same rules and drawings.

Is epoxy coated pipe safe for drinking water?

Yes, as long as you say so. A group like NSF/ANSI 61 in the US must say that the coating is safe. Before you place your order, make sure you have these papers for the coating you want. Just ask the person selling it what it's called.

How do I limit coating damage during shipping?

On the order form, you should write that you need bumpers, soft slings, end caps, and protective wrapping. Check out the cargo and take pictures of it when it gets there. If it's broken, fix it with a safe material before you put it in place. Cover pipes that will be outside for more than six months to keep UV chalk from building up.

Can the coating handle hot service?

Regular epoxy doesn't turn into glass until it gets very hot, about 100°C. It doesn't stick as well and isn't as strong above that, so hot lines need high-Tg epoxy powder. Tell them what your highest temperature is when you're in the RFQ stage.

Get Your Epoxy Coated Carbon Steel Pipe Quote From Longma Group

Drop Longma Group an email at info@longma-group.com with your plans, the type of pipe you need, the coating you want, and the address where the goods need to go. They will be looked over by our team to make sure they meet your needs. We provide pipe, coating, and ITP, MPS, and MTC documents as a producer of epoxy coated carbon steel pipe for ERW and LSAW applications. Find out more at longma-group.com and then get a quote right away.

References

  1. AWWA C213, Fusion-Bonded Epoxy Coating for the Interior and Exterior of Steel Water Pipelines, American Water Works Association, 2015
  2. AWWA C210, Liquid-Epoxy Coating Systems for the Interior and Exterior of Steel Water Pipelines, American Water Works Association, 2015
  3. CSA Z245.20, External Fusion Bond Epoxy Coated Steel Pipe, CSA Group, 2018
  4. API Specification 5L, Line Pipe, 46th Edition, American Petroleum Institute, 2018
  5. NACE SP0490, Holiday Detection of Fusion-Bonded Epoxy External Pipeline Coatings of 250 to 760 µm (10 to 30 mil), NACE International, 2007
  6. Importing into the United States: A Guide for Commercial Importers, U.S. Customs and Border Protection, 2006